Holded for engineering: every project, with its real cost under control

An engineering project rarely fails due to lack of work. It fails because no one knows, until it’s too late, if the hours spent and the materials purchased match the budget. The tracking Excel is in one place, billing in another, and the team’s hours are recorded (if they are recorded) somewhere else entirely.

Holded connects budgets, hours, purchases, and billing in one place, so you always know which projects are profitable and which ones are eating into your margin. At GROUPmee, as an Official Holded Solution Partner, we set it up according to how your engineering firm or company actually works.

Logo Holded GROUPmee

BUDGETS THAT TURN INTO CONTROL, NOT JUST PAPER

Every engineering project starts with a budget: estimated hours per phase, materials, subcontracting, margins. The usual problem is that this budget gets filed away and no one compares it to reality until the closing, when there’s no room to maneuver.

With Holded, the initial budget is linked to the project from day one. As hours, expenses, and purchases are recorded, you can compare what was budgeted to what actually happened at any time, phase by phase.

Key benefit: you spot a cost deviation in phase 2, not in the final project report.

ONE PROJECT, MANY PHASES: VISUAL PLANNING

Engineering projects are almost never linear: there are phases of design, calculation, processing, execution, and delivery, often running in parallel across multiple active projects. Holded lets you structure each project into phases and tasks, with Kanban-style views so you can see at a glance where each one stands and who’s responsible for what.

We set up the phases according to your studio’s methodology (by discipline, by deliverable, by contractual milestone) instead of forcing you to adapt to a generic template.

Key benefit: the entire technical management team can see the real status of active projects without having to ask anyone for a report.

RECORDED HOURS, VISIBLE PROFITABILITY

In engineering, the technical team’s time is the main cost of any project. If hours aren’t tracked consistently, it’s impossible to know if a project is profitable until it’s already closed, and by then the learning comes too late.

Holded links the hours logged by each person to their corresponding project and phase, and matches that data with what’s been invoiced. The result is real profitability per project, per client, or per type of service, updated in real time rather than manually rebuilt in an Excel sheet at the end of each quarter.

Key benefit: you know what types of projects give you the most margin before deciding which ones to say yes to.

PURCHASES, SUPPLIERS AND SUBCONTRACTS UNDER THE SAME UMBRELLA

Engineering projects usually involve purchasing materials, renting equipment, or subcontracting facilities and technical specialties. When those expenses aren’t linked to the project that caused them, the real cost gets diluted and it’s hard to pass it on or justify it to the client.

With Holded, every purchase or supplier expense can be directly linked to the corresponding project, so the cost of materials and subcontracting is reflected in the same project profit and loss account as the team’s hours.

Key benefit: the real cost of a project includes materials and subcontracting, not just in-house hours.

BILLING BY PHASES AND CERTIFICATIONS

Many engineering projects aren’t invoiced all at once, but rather by milestones, phases, or partial certifications as the work progresses. Managing this manually usually means duplicating information between project tracking and the invoice sent to the client.

Holded lets you invoice entire projects or specific phases, linking each invoice to the actual progress of the work and the corresponding hours or expenses, without having to recreate that information separately.

Key benefit: you invoice what has actually been done, backed by hours and expenses already recorded in the system.

A CONNECTED ECOSYSTEM, NOT LOOSE TOOLS

Muchos estudios de ingeniería gestionan captación de clientes en un CRM, planificación técnica en un gestor de proyectos y contabilidad en otro sitio, sin que esos sistemas se hablen entre sí. En GROUPmee somos también Partner Oficial de Pipedrive y de Asana, y conectamos Holded con estas y otras herramientas para que la información fluya de un extremo a otro: desde que se cierra un proyecto hasta que se certifica y se factura.

Beneficio clave: dejas de introducir el mismo dato tres veces en tres sistemas distintos.

¿ES HOLDED PARA TU EMPRESA DE INGENIERÍA?

Holded encaja especialmente bien si tu empresa:

  • Gestiona varios proyectos en paralelo y necesita ver la rentabilidad de cada uno por separado
  • Factura por fases, hitos o certificaciones en lugar de una única factura al cierre
  • Tiene un equipo técnico cuyas horas son el principal coste a controlar
  • Trabaja con proveedores y subcontratas cuyo gasto debe repercutirse a proyectos concretos
  • Quiere sustituir el seguimiento en Excel por datos actualizados en tiempo real

 

Si tu operativa es más compleja, con múltiples equipos trabajando en paralelo sobre un mismo proyecto con dependencias avanzadas entre tareas, hablamos contigo para valorar si Holded cubre esa necesidad o si conviene combinarlo con otra herramienta de gestión de proyectos dentro de tu ecosistema.

PREGUNTAS FRECUENTES PARA INGENIERÍA

¿Holded sustituye a un software de gestión de proyectos técnico (BIM, CAD, etc.)? No. Holded no gestiona el diseño técnico ni el cálculo de ingeniería: se ocupa de la parte de gestión, costes, facturación y rentabilidad del proyecto. Convive con tus herramientas técnicas, no las sustituye.

¿Podemos migrar los proyectos activos sin perder el histórico? Sí. Nos encargamos de la migración de datos desde tu sistema actual (Excel, otro ERP o software de gestión) para que el histórico de cada proyecto se mantenga.

¿Se adapta a la forma de facturar por certificaciones habitual en proyectos de obra o instalaciones? Sí, configuramos la facturación por fases o hitos según el modelo contractual que uséis con vuestros clientes.

¿Cuánto tiempo tarda la implementación? Depende del número de proyectos activos, del volumen de datos a migrar y de las integraciones necesarias. En la mayoría de estudios de ingeniería, la implementación completa se resuelve en varias semanas, sin interrumpir la operativa diaria.

¿Qué diferencia contratar Holded con GROUPmee frente a contratarlo directamente? Como Solution Partner Oficial de Holded, GROUPmee no solo te da acceso al software: analizamos tu operativa, configuramos los proyectos y la facturación según tu forma real de trabajar, migramos tus datos y formamos a tu equipo técnico y administrativo.

EMPIEZA POR ENTENDER CÓMO TRABAJA TU ESTUDIO

Antes de configurar nada, analizamos tus proyectos actuales, tu forma de facturar y las herramientas que ya usas. Así te recomendamos la configuración de Holded que encaja con tu realidad, no con una plantilla genérica.